Explain the layout and the purpose
Include the length and height of the wall, proposed door position and any shelving, screens or cabinetry that will be fixed to it. Privacy expectations also matter. A drawing of the new layout helps identify the interface with existing ceilings, flooring and circulation.
Clarify who builds the full partition
Framing and plasterboard lining are related but distinct tasks. Ask whether doors, insulation, services and skirting are included, provided by others or still to be designed. Any specified performance requirement should be part of the enquiry before a contractor selects a lining assembly.
Agree the final edges and access plan
Describe how people will move through the property during installation. New partitions may require finishes at the floor and ceiling to be altered. Those interfaces, plus painter preparation, should be allocated in the scope so the completed wall does not leave unassigned work around it.
Questions about plasterboard partition walls.
Can a partition include a glazed section?
Include the glazing requirement on your sketch or plans. The framing, glass and plasterboard work need clear coordination and scope boundaries.
Can an existing room be divided for more privacy?
It can be assessed. Explain the intended use, access and sound expectations so the full layout and wall assembly can be considered.
Explore the complete Plasterboard Installation Wollongong service guide, or tell us what your project needs below.

